The bridge that takes the red Moretta Blanche piste over the road to the chalets (the first bridge up from the car park) is currently in a mangled up state.
The diversion is now back in place. No news yet of for how long and what the issue with the bridge is – or if it’s being altered in some way. There has been some concern around the routing of the red piste down to the gondola during the Moretta Village construction – could this be something to address this concern?
The construction / planning permit for the Moretta Village has been posted this week “La realisation d’un Hôtel, de Residences du Tourisme, de Commerces et d’Equipememts Publics”’.
Thanks to Snowbound Transfers and Florence R for the heads up on this.